Showing posts with label pullover. Show all posts
Showing posts with label pullover. Show all posts

Friday, August 8, 2008

Rescue Pullover in Progress


This isn't perhaps the best photo because it shows the yarn as brighter than it really is. This is the failed Mardi Gras skeins overdyed in Indigo and the start of an aran-style pullover.

Sunday, June 8, 2008

The "Rescue" Pullover

I'm working on a pullover now from the worsted weight Mardi-Gras-Overdyed-Indigo yarn. After 16 rounds of 2 x 2 ribbing, I've settled on a pattern of moss stitch and diamonds and even a couple of cables. The trouble was that I didn't plan it particularly well so the ribbing doesn't necessarily match up with my cables and such, but I've decided that it's not a big deal. I'm not knitting this for submission to a publication.

This a pullover for my brother-in-law Ron who has been working on cleaning up a Toyota knitting machine I'd purchased last fall from a widower. I don't know how long it had been since his wife had used it, but it was kind of crusty in places. So, Ron is patiently cleaning it. Thus, I am patiently (really) knitting a pullover for him. The stitch gauge is 5 st/1" in stockinette on US 7 needles. I cast on 256 (I'm knitting it in the round) and worked the above-mentioned ribbing. It has a center diamond (in purl stitch on a field of knit stitch). In fact, it goes (from left to right): K 17, Diamond (over 14 sts), K2, 5-stitch moss, K2, P2, C6B, P2, K2, 5-stitch moss, K2, center Diamond, K2, 5-stitch moss, K2, P2, C6F, Ps, K2, 5-stitch moss, K2, Diamond, K17. And then it repeats on the other side, and it's a 12-row pattern. I'm not sure whether I'm going to work it as a drop shoulder or a set-in sleeve. I'll think about it.

The first few rounds are a little difficult. I increased 4 sts on each side in the set-up round after the ribbing in order to account for the cables pulling things in on rounds 3 and 9. I have a zillion markers in it all to give me a cue when things start, but I expect I'll be able to pull them out once the overall pattern becomes clearer. Right now it looks like a dark mess of ribbing with bright markers in it.

If you want the stitch pattern, I have it set up in an Excel spreadsheet and I will be glad to email it to you if you send me a note requesting it.

Wednesday, January 2, 2008

This year . . .

I will finished one project before starting another.

But first I have to finish the projects I already have on needles:
  • Socks for Marky (need to start #2)
  • Socks for Deb (#1 near heel turn)
  • Socks from Austermann Step yarn (#1 near the toe)
  • Hoofle-Foofle Socks (#1 done; #2 started)
  • Cardigan (finish sleeves and button band)
  • 8-3-5 Pullover for Marky (back done; front started)
  • Scarf from bulky weight Silk Road *Done • 5 Jan 08*
  • Scarf from 2 strands of Manos del Uraguay *Done • 10 Jan 08*
  • Socks for Alice *Done • 5 Jan 08*
  • Shrug for Mary (started back panel)
  • Baby Blanket for Jorge y Liliana

These are the projects already waiting for me to start on:

  • Socks for Joan
  • Swag Socks sample for String of Purls
  • Marjaana/Hermione pullover for myself
  • Scarf (non-wool) for I-Pie

Hmmm....lots of socks again this year!